Baseline Review
Calculated by my engine
- The calculated finish date and driving path for each facility, by longest path through the logic Saves tracing each facility’s path by hand.
- Shared upstream work shown once, not repeated under every facility it feeds Saves reading one problem as several.
- Facilities ranked, in a facility overview and a facility Gantt Shows at a glance which facility drives the finish.
- Each record the engine excludes from the calculation, listed with its reason Nothing is dropped silently.
My review
- A quality review of logic, constraints, float, calendars and durations, using industry-standard checks in the style of the DCMA 14-point assessment Saves your planners marking their own homework.
- A claim-structure read: for each facility’s driving path, the defects that would shape a later delay analysis, ranked by effect on that facility’s finish Shows what a later claim would be built on, before it is accepted.
- A fix list, a short written report and a read-out call with your team Tells your planner what to fix first.
- One-page board brief. Which facility drives the finish, what drives it, and which baseline defects matter most, written for readers who are not planners.
- Planner working session. 60 minutes with your planner, going through the fix list item by item.
- One re-run of the corrected file. Same file, within the size agreed at scoping and within a period agreed at booking, with a one-page note of what changed in each facility’s finish and driving path.
Named bonus, in the fee
Seal 00: sealed as month zero
The baseline as received, unchanged since sealing, and the anchor for everything after it. I hash and timestamp the baseline as received and prepare its verification pack. If a corrected baseline is accepted, I seal that version too, so the record shows which file became the yardstick.
I do the sealing myself, with standard tools. A hash proves a file is unchanged since it was sealed. It does not prove the file is right. What a seal proves, and what it does not
Fee and terms
- Fee
- Fixed fee, agreed after a short scoping call
- Turnaround
- A turnaround agreed in writing at booking, counted from receipt of a readable .xer (a P6 export the engine can open and calculate; any records it excludes are listed with reasons)
- Scope
- One baseline .xer, with files within the size agreed at scoping. Larger files are quoted
- Fee credit
- The Review fee is credited to the Sealed Schedule Record if it starts within a period agreed at booking
Service commitment: on time and complete
If any core deliverable listed under the Review is missing, or the read-out is not delivered within the turnaround agreed at booking, I complete it at no charge and credit part of the fee.
This covers what I control: the work, its completeness and its timing. It is not a guarantee about the finish date or about any claim.